Gilbert Police Department – AZ

GILBERT POLICE DEPARTMENT – TWO INDOOR RANGES, ONE MISSION. Built for a 30-year horizon, Gilbert PD’s joint Police/Fire training center delivers scale, realism, and control. Two 20-lane indoor ranges (25-yard and 50-yard), a TAC House Kit #4, and fully integrated Action Target systems—Vortex TCT traps, tactical baffles, fixed lateral turning targets, DRM Pro (Range 1), […]
Broward County Sheriff’s Office, FL
the most innovative multi-range facility providing total tactical control The Broward County Sheriff’s Office Research, Development & Training Center is a multi-range indoor hub built at scale to elevate realism, throughput, and instructor control. Two purpose-built tactical bays pair tactical baffles, a Fixed Lateral 360° Target System, and DRM Pro moving targets—coordinated through SmartRange Axis […]
Utah Highway Patrol – Murray, UT

UTAH HIGHWAY PATROL INDOOR RANGE – BUILT FOR PRECISION Located in Murray, Utah, this 18-lane, 25-yard indoor Law Enforcement range represents one of Action Target’s most advanced builds—blending deep-rooted innovation with elite-level performance. Outfitted with comprehensive safety, containment, and control systems, this range is a standout facility designed for tactical training, MATCH simulation, and total […]
Utah County Sheriff’s Office, UT

utah county sheriff’s outdoor range—built with action target In Thistle, Utah the Utah County Sheriff’s Office partnered with Action Target to create an outdoor law enforcement training facility shaped by real-world needs. We listened first, then engineered a system that works—efficient, reliable, and tailored to their mission. The complex brings together a covered MATCHTM ballistic […]
Scottsdale Police Department, AZ

the newest state of the art facility for law enforcement In partnership with the City of Scottsdale, Action Target delivered a cutting-edge indoor law enforcement shooting range designed to meet the rigorous training needs of public safety personnel—while prioritizing performance, safety, and long-term operational value. A key component of this project was the total acoustic […]